Positioning
coordinates


PPP using combined GPS/ GLONASS measurements

Jan 2012 | No Comment

This study investigates the effect of combining GPS and GLONASS dual-frequency measurements on the static PPP solution and its sensitivity to different processing strategies

Mohamed Azab

Visiting graduate student(Ph.D.), Department of Civil Engineering
Ryerson University Toronto, Ontario, Canada

Dr Ahmed El-Rabbany

P.Eng. Professor, Geomatics Engineering Graduate Program Director,
Department of Civil Engineering, Ryerson University Toronto, Ontario, Canada

Dr M Nabil Aly Shoukry

Professor, Surveying and Geodesy, Department of Civil Engineering,
Faculty of Engineering, Alexandria University, Alexandria, Egypt

Dr Ramadan Khalil

Professor, Surveying and Geodesy, Department of Civil Engineering,
Faculty of Engineering, Alexandria University, Alexandria, Egypt

GPS was offi cially declared to have achieved full operational capability (FOC) on July 17, 1995, ensuring the availability of at least 24 operational, non-experimental, GPS satellites. To meet the future requirements, the GPS decision makers have studied several options to adequately modify the signal structure and system architecture of the future GPS constellation. The modernization program aims to, among other things, provide signal redundancy and improve positioning accuracy, signal availability, and system integrity (El- Rabbany 2006 ). Unfortunately, even with the modernized system, there exist situations where the GPS signal may be partially obstructed, e.g. in urban canyons, which in turn affect the availability and reliability of the PPP solution

To improve the availability, positioning accuracy and reliability of the PPP solution, we propose to combine the GPS and GLONASS constellations. GLONASS has been gradually replenished since 2002 and has reached a total of 22 operational modernized satellites at present (Defraigne and Baire 2010; Springer and Dach 2010). In addition, Russia is planning to include eight different Code Division Multiple Access (CDMA) signals, along with its existing Frequency Division Multiple Access (FDMA) transmissions.

This study investigates the effect of combining GPS and GLONASS dualfrequency measurements on the static PPP solution and its sensitivity to different processing strategies. Many data sets from IGS tracking stations distributed across North America were processed using the Bernese GPS 5.0 software package. It is shown that the addition of GLONASS constellation improves the number of visible satellites and geometry (PDOP) by more than 60% and 30%, respectively. Statistical analysis of PPP results shows that the performance of the combined GPS/GLONASS solution is superior to that of GPS-only solution. However, the improvement in the fi nal daily (i.e., with 24 hours of observations) solution is not signifi cant.

System availability

To verify the improvement in the system’s availability, we used the GSSF simulation software to generate the global coverage and PDOP maps for the GPS and the combined GPS/GLONASS constellations, respectively, on November 9, 2010. As can be seen through the satellite coverage map (Figure 1), the addition of GLONASS constellation improved the global coverage by more than 60%. In addition, it improved the satellite geometry by 30% to 60% and eliminated dead zones (Figure 2).

Modeling and processing of combined GPS/GLONASS PPP

To examine the feasibility of combining GPS and GLONASS observations for PPP, we used the Bernese 5.0 software package, developed at the Astronomical Institute at the University of Bern (AIUB), to process GNSS observations from both systems. Bernese Processing Engine (BPE) tool was used to modify an existing automated GPS data processing control fi le (PCF) and to build a new automated PCF for combined GPS/GLONASS observations (Habrich 1999; Dach, Hugentobler et al. 2007). Common errors and biased were taken into account, including the relativistic effect, phase center variation (PCV), solar radiation pressure for both GPS and GLONASS satellites (see Kouba 2009 for details).

Data sets from fi ve International GNSS Service (IGS) tracking stations across North America (Figure 3) were acquired for November 9, 2010. Precise orbits and clocks corrections were obtained from the European Space Agency (ESA) to satisfy the compatibility conditions of orbit and clock corrections. Differential code bias (DCB) and ocean loading corrections were downloaded from the Center for Orbit Determination in Europe (CODE) and the Onsala Space Observatory (OSO) websites, respectively.

Combined GPS/GLONASS PPP results

Estimation of system time difference

The estimation of system time-difference between GPS and GLONASS is an essential step for the combined GPS/ GLONASS standalone solution. Unfortunately, because there are no available calibrated values for the hardware delay of GLONASS receivers, the inter-system hardware delay will be included in the estimated time difference (Habrich 1999; Cai and Gao 2007). In the sequel, we will refer to the biased system time difference by TDGG.

To verify the short-time stability of TDGG estimation, the combined GPS/GLONASS processing control fi le was used to estimate TDGG values every hour, for the fi ve selected stations, over the 24 hours under consideration. Figure 4 shows the hourly estimation of TDGG at the selected IGS stations over 24 hours. As can be seen, the estimated hourly values of TDGG agree to within 10 ns, except for station SCH2. For stations with same receiver/antenna brand (Table 1), the system time difference values agree to within 5 ns. However, discrepancies of up to 130 ns in the values of TDGG occurred between stations with different receiver/antenna confi guration, which refl ect the contribution of hardware delay.

PPP results and analysis

As indicated earlier, data sets from fi ve IGS reference stations (Figure 3) were processed using the Bernese software. The obtained results show that there is a signifi cant improvement in the convergence and repeatability of the combined solution, especially in the fi rst observation hour. Figures 5 and 6 show the PPP solution convergence, fi nal solution accuracy and repeatability results are presented for station NANO as an example. Similar results were obtained for the other stations.

As can be seen in Figures 5 and 6, positioning accuracy of 3 cm can be achieved with only 30 minutes of observations for the combined GPS/ GLONASS solution, while it requires about 3 hours for the GPS-only solution to achieve the same accuracy level. However, the two solutions become comparable after 6 hours.

To examine the repeatability of the combined GPS/ GLONASS solution, positioning errors were estimated every hour over the 24 hours under consideration. Figure 7 shows the hourly positioning error for both of GPS-only and combined GPS/ GLONASS solutions. As can be seen, the combined solution has better repeatability in 75% of cases.

Conclusions

This study investigated the performance of dual-frequency GPS/GLONASS PPP solution. It has been shown that the addition of GLONASS constellation improved the satellite availability and geometry by more than 30%. This allows for precise surveying in urban areas or when the satellite signal is partially obstructed. In addition, the performance of the combined GPS/GLONASS PPP solution was found to be superior to that of GPS-only solution. While a few centimetre-level accuracy can be achieved within 30 minutes with combined GPS/ GLONASS PPP solution, it requires about 3 hours with GPS-only solution.

Acknowledgments

This work was carried out at Ryerson University and was supported in part by Ryerson University and the Egyptian Ministry of Higher Education. The fi rst author acknowledges the fi nancial support provided by the Government of Egypt to carry out this reseacrh. Observation data and ESA Precise orbits and clocks corrections were obtained from the NASA/Goddard Crustal Dynamics Data Information System (CDDIS) website http:// cddis.gsfc.nasa.gov; differential code bias (DCB) were obtained for the Center for Orbit Determination in Europe (CODE) website http://www. bernese.unibe.ch/; and ocean loading corrections from the Onsala Space Observatory (OSO) website http:// froste.oso.chalmers.se/loading//, their contibutions are appreciated.

References

Cai , C. and Y. Gao (2007). “Precise Point Positioning Using Combined GPS and GLONASS Observations.” Global Positioning Systems 6(1): 10.
Dac h, R., U. Hugentobler, et al. (2007). User manual of the Bernese GPS Software Version 5.0, Astronomical Institute, University of Bern.
Def raigne, P. and Q. Baire (2010). “Combining GPS and GLONASS for time and frequency transfer.” Advances in Space Research 47(2): 11.
El- Rabbany, A. (2006 ). Introduction to GPS: The Global Positioning System, Second Edition Boston, USA, Artech House publisher.
Hab rich, H. (1999). Geodetic Applications of the Global Navigation Satellite System (GLONASS) and of GLONASS/GPS Combinations, Technische Universität München.
Kouba, J. (2009) “a guide to using international GNSS service (IGS) products.” Avaialble at http://igscb.jpl. nasa.gov/components/usage.html
Spr inger, T. and R. Dach (2010) “GPS, GLONASS, and More Multiple Constellation Processing in the International GNSS Services.” GPS World 21, 6.

My Coordinates
EDITORIAL
His Coordinates
Antonio Tajani
Conference
ESRI India User Conference
Mark your calendar
January 2012 TO November 2012
News
INDUSTRY | LBS | GPS | GIS | REMOTE SENSING | GALILEO UPDATE

1 Star2 Stars3 Stars4 Stars5 Stars (6 votes, average: 1.17 out of 5)
Loading...


Leave your response!

Add your comment below, or trackback from your own site. You can also subscribe to these comments via RSS.

Be nice. Keep it clean. Stay on topic. No spam.