Articles tagged with: Haitao Xu

Oct 2009 | No Comment
gfx9

Generally, the entire railway line is divided into several sections, and each section is fi nished separately.
Firstly, we need to collect the existing information of one section, such as map and control points. Then, survey the topography of the working area, select position of control points, set the control point network, and produce the control points by GPS static survey…