River cross-section surveying using RTK Technology

Dec 2006 | Comments Off on River cross-section surveying using RTK Technology

 
The Yangtze River project case study
   

China has a vast expanse of land with intertwining rivers and mountains, abounds in lakes and reservoirs. The survey of rivers and lakes as well as the protection and exploitation of these resources plays an important role in Chinese economy. Cross-section survey of water bodies is a key part in hydrographic engineering survey. Traditional methods of cross section survey of a river such as theodolite intersection, theodolite stadia, electronic distance measurement, depth-surveying bar, leadline, handlead survey and echo sounder are the main methods used for water bathymetry. These methods are not only prone to the inaccuracy of instruments, distances, weather conditions, intervisibility and communication device, but also involved in tedious workload which leads to low efficiency. Some unfavorable factors such as the flow of the water and the nonlinear movement of the surveying ship make measuring the depth of the water more difficult. Lack of skills and cooperation among surveyors might result in a low accuracy in the position fix of cross-section points, thus further affects the quality of cross-section survey of the river. The application of real-time kinematic (RTK) GPS positioning technique has opened a new avenue for the crosssection survey of rivers (Wu, 2005). Simultaneous utilization of RTK GPS technology and the shipboard sounding method (e.g. digital depth sounder) will greatly improve the accuracy and efficiency of cross-sectioning survey of rivers(Qiu and Fong, 2002; Qiu 2004; Zhang et al, 2002).

Basic principles of RTK GPS

For high accuracy GPS positioning, “differential” GPS technique is used where one receiver acts as “the base” and the rover is positioned in a close vicinity of the base to take advantage of the nature of spatial correlation of the GPS measurement errors such as atmospheric delay, orbital errors, clock errors and other factors in GPS survey. Carrier phase measurements are taken and unknown integer cycles of the carrier waves (i.e. the integer ambiguities) need to be resolved prior to the baseline solution is computed through a “double-differenced” process. Real-time data processing of the GPS measurements at both base and rover stations will make it possible to obtain the stations’ realtime three-dimensional coordinates with a centimeter level accuracy after a successful initialization process (Hu et al., 2005). In practice, a GPS receiver is set on a base station whose coordinates are precisely known. This GPS receiver is connected with a data transmission mechanism, which transmits the observations and the base station information to (one or more) remote roving receivers. With the GPS signal corrections transmitted in real time from a reference receiver at a known location and the information from four or more visible satellites, a data processing is carried out in real time at the rover station, and the ambiguity resolution, position and accuracy of the rover station is obtained. The critcal requirements of the RTK techniques include: simultaneous measurements from a minimum of two GPS receivers, the separation of the base and rover is less than 10- 20km and an on-the-fly data link.

dec-2006-image12

Cross-section survey of river in Jinjiang Reach

Introduction of the Project

Yangtze River is our mother river. Chinese people have been living by the mother river generation by generation happily and benefited greatly. At the same time, people have suffered a lot when serious floods occurred.

According to historical records the damage is low along lower reaches, high along upper reaches and most severe along middle reaches where Hubei province is located. Taking 1998 as an example, Hubei Province experienced a heavily flooding year with 66 counties waterlogged, 1.54 million hectares of fertile farmland flooded, and 3.83 billion RMB of properties lost (Lei et al., 2000). Figure 1 shows the middle reaches and lower reaches of the Yangtze River and the geographical location of the survey project area respectively.

The portion between ZhiCheng and ChengLingJi of the Yangtze River is named Jingjiang Sector, which is the crucial sector of the middle reaches of the Yangtze River and is 347.2 km long (OuChiKou is considered as the dividing line of the upper Jingjiang stretch and lower Jingjiang stretch respectively). Figure 2 shows the run of the Jingjiang sector. The upper Jingjiang stretch is a slightly curved bifurcated reach, while the lower Jingjiang Reach is a meandered reach. There is an important dike along Yangtze River – the Jingjiang embankment in the north side of the river.

During the past several decades, the Yangtze River has silt up and the riverbed has been elevated significantly. As a result, the flood water level of the Yangtze River, similar to Huanghe River, the second biggest river in China, has risen by 1.5 to 2.5 meters along the middle reach. Significant changes have taken place in Jingjiang reach since the extraordinary floods in 1998 and 1999, respectively. The bifurcated reach has seen frequent flow fluctuations of the mainstream, erosion and sand deposition of the shoals. The water level of the Three Gorges Reservoir impoundment reached 135 meters in June 2003 and this led to the release of clear water and scoured in the downstream of the Three Gorges Dam. This made Jingjiang reach threatened by frequent bank failures, and the high risk of Jingjiang flood has not been mitigated.

Therefore, to investigate the run of the river along the Jingjiang reach is of paramount importance. To meet the needs of the assessment of potential risk, emergency management, and safety research of shipping and the design of other Yangtz river related engineering projects, river course survey of the Yangtze River along the Jingjiang reach is carried out.

dec-2006-image13

The survey system requirements

Two sets of dual frequency geodetic GPS receivers (Trimble 5700) are used for the survey. The manufacturer’s specification of the receiver is: 10 mm+1ppm (Horizontal) and 20 mm+1ppm (Vertical) for kinematic survey. One receiver is set as a base station with an on-the-fly datalink capability. The other GPS receiver is a rover receiver that is used in the survey ship. A laptop computer, SDH- 1C3D numeral echo sounder and other necessary accessories (e.g. power supply, and other fittings) are used. A survey software package (Hypack), cadastral and topographical plotting software CASS 4.0 are also used. Figure 3 shows some field operation and station setting up of the survey using both GPS and a total station.

Cross-section survey

Along the riverbanks, there is a dense flood protection forest. It would be very labor intensive and resources demanding if the conventional cross sections survey technique is used to carry out the survey, this is particularly true for the control survey to connect the area with n high-order ational control points (Jiang et al., 2001; Zhao, 2005). In this aspect, the adoption of the RTK GPS technology is ideal. First, a preliminary design is conducted to use the existing 1:2000 bathymetric map of the Yangtze River. The crosssection survey lines are designed to be roughly perpendicular to the direction of the river course. The positions of the cross-sections control points are then selected in open fields and monuments are established. Each cross-section usually consists of two cross-section points and one in each side of the river. Finally, the 3-D coordinates (both plane coordinates and height) of the points are surveyed. The three-dimensional coordinates of each cross section line are input into a laptop computer. Appropriate geodetic datum parameters in the laptop computer are chosen priori to the computation of the results and the WGS-84 coordinate system and transverse Mercator projection are used in the survey. The unit of the measurements is meters and the area surveyed is located at geographical position of longitude 111°18’00″E to 111°18’10″E and latitude 22°31’25″N to 22°31’35″N respectively.

During GPS survey, a base station needs to be located over a known point and the base station should be chosen in such a way that there is no potential strong disturbance sources such as electromagnetic wave, microwave, high voltage power line disturbance etc to avoid the effects of the GPS signal reception and transmission. Before formal survey commences, known control points need to be checked first so that any transformation parameter mistakes or the data/ parameters errors can be detected and corrected (Huang et al, 2001). Then two points of a cross section line will be measured then their coordinates will be automatically produced in the laptop computer and displayed on the screen. At the same time, the laptop computer will also show the position and station number of the surveyor. So the surveyor may know whether he/she is on the cross section line or not as well as knowing intervals between the stations. The component of the station 3-D coordinates from GPS is also re-surveyed using an Electronic Total Station (ETS) for both confirmation and quality check.

dec-2006-image14

 
–~~~~~~~~~~~~–

Cross-section survey of the river

Cross-section survey of the river depends on cross-section measurement method used. The cross-section interval will be set about 200 meters apart, and Trimble 5700 GPS is used to fix horizontal position. GPS reference stations are located at open, ashore known points so that the reception of GPS satellite signals is not potentially blocked and the data link of GPS signal transmission does not pose any problem. GPS roving station is located in a powerboat for bathymetric survey. A common set of GPS satellites are recorded at both the reference and rover stations simultaneously. Coordinates of the mobile station are computed using both the received GPS satellite information and the differential information from the reference station via the data link. The SDH-13D digital echo depth sounder is used to measure water depth of the points. The sounding pole of the echo sounder and the GPS rover station antenna are put in the identical horizontal position. The echo sounder is controlled by the computer to collect water depth signals in an electronic form and then transformed into a digital form (i.e. numbers).

The river cross-section survey data collection and recording is carried out by the laptop computer with the Hypack survey software. Each cross section line is roughly perpendicular to the shoreline with an interval of 200 meters. Before the survey is carried out, the space of the measurement points needs to be established in the Hypack survey software. The survey boat is driven along with the cross section line while the laptop computer collects coordinates and the depth of water automatically.

The height is measured through trigonometrical leveling with ETS. The height of each cross section is derived from the ETS. The elevation of the underwater surveying point is therefore deduced from the water level and the water depth. During the survey process, water level at the related hydrometric station and water level observation station is recorded at the same time for a necessary check.

Data processing and visualization

The office work consists of the following two parts: data edition and visualization

After the field survey work, GPS data which is recorded in the receiver/or data card needs to be downloaded through Trimble proprietary software package – TGO (v1.6).

Four data files will be created. They are observation file (*.o) carrier phase and pseudo range observation file, navigation file (*.n), epoch parameter file and survey station information file.

GPS baseline vector is processed in order to promptly check the quality of the field observation data. 17 control points of Shashi river reach are used as checking points to evaluate the RTK GPS results. Coordinates from GPS RTK are compared with the coordinates derived from Electronic Total Station measurements. The results are listed in the following Table 1. As for the height component, China national standard datum is used. The model of Electronic Total Station is Nikon DTM532 – C, with an angle measurement precision of 2 seconds and distance measurement precision of 2mm+2ppm. The maximum distance measurement range is 3,600 meters.

According to the statistical results shown in Table 1, the maximum difference of the horizontal locations among the control points is 0.36m. The elevation difference is generally less than 0.1m, which illustrates the coordinates by RTK method and ETS is within the allowable error of this type of project. We can, therefore, conclude that the surveying results are accurate and reliable. During the process of office plotting, a specific plotting software package is used to edit the data collected in the field and all the data are transformed into discernable format by the topographical and cadastral plotting software package CASS4.0. The chart is plotted under the AuotoCAD2000 environment. The chart of the 413th half river cross-section in Shashi river gulf is shown in Figure 4.

dec-2006-image15

The next generation of GNSS

In many regions, the availability of a GPS reference station network means that surveyors can utilize RTK GPS without the need to set-up their own local reference station. They can simply go to the field, set up a communication link to a GPS reference station network infrastructure then begin RTK GPS surveying. GPS reference station networks are increasingly popular as many government agencies have found it more economically viable to invest in GPS reference station networks rather than maintaining traditional ground geodetic control network. Using an array of permanently installed reference stations over a region or entire state removes the need to establish local control in the work area and set up temporary field reference receivers.

The motivation behind using multiple reference stations for GPS corrections is to model and correct for distancedependent errors that reduce the accuracy of conventional RTK positions in proportion to the distance from a rover to its nearest reference station. Two leading international companies, Trimble Ltd and Leica Geosystems, have developed a network solution software, called GPSnet (VRS-Virtual reference station) and Spider (using the Master-Auxiliary Concept) respectively, to generate RTK corrections through a network of reference stations (Trimble Navigation Ltd. 2006; Leica Geosystems, 2006).

The main benefits of next generation GNSS are its rich space infrastructure, rich signal, and better geometry which can significantly reduce the position dilution of precision (PDOP) factor and provide additional system for cross check. The most valuable benefit will be the enhanced resolution of the integer ambiguities encountered in carrier phase tracking as the receiver attempts to determine the unknown number of full cycles between the carrier wave received and the one generated locally.

dec-2006-image16

Conclusion

It is of great advantage to apply the RTK GPS technology to the surveying project of the banks and cross sections of the river, for it achieves fast position fix with a high accuracy, high efficiency and high productivity in comparison with the traditional time-consuming and labor-intensive surveying practice. The project demonstrates that the Trimble 5700 GPS receivers, integrating with the SDH-13D digital echo depth sounder, can be one of the best solutions for the survey of the Yangtze River. More significantly, the application of the GPS RTK technology to Yangtze River surveying at Jingjiang reach made it possible to meet the needs of all other engineering projects related to Yangtz River in dry seasons. As a result, the completion of the project in a dry season is a critical support to other highly-prioritized projects such as Three Georges Dam construction. The accomplishment of the project sets a good example to implement surveying of big river like Yangtze River and Huanghe River which are the two biggest rivers in China.

To gain accurate and reliable survey results, our experience suggests that

1. When satellite signals are blocked by objects such as tall buildings or big trees, RTK GPS survey may experience problems. This may lead to a system initialization problem since the requirement for a minimum number of satellites cannot be met and the receiver cannot be initialized. At this circumstance, it is necessary to use conventional surveying techniques for the collection of the field data.

2. When undertaking the bathymetric surveying, the rover receiver is mounted on the boat. Because of the tumbling and rushing of waters, it is paramount important to be sure that the GPS positioning data matches the depth surveying data of water. That is the GPS surveying and the digital echo depth sounder surveying must be synchronized perfectly.

3. Occasionally, the rover GPS receiver experienced signal reception problem which leads to a difficulty to successfully resolve integer ambiguities. This is mainly because the GPS antenna is interfered by the radio signal transmitted from the reference station. It is therefore, suggested that the antenna of the radio transmitter should be far enough from the GPS antenna.

References

Eissfeller, B.; Tiberius, C.; Heinrichs, G.; Pany, T (2002) Real- Time Kinematic in the Light of GPS Modernisation and Galileo, GPS World, October issue.

Huang S., Liu X., Application of GPS in the Construction Datum Transfer for High-Rise Buildings, Engineering of Surveying and Mapping, Mar. 2001.

Jiang C., Peng J., et al, Study on Establishment Method of Three- Dimensional Control Network in GPS Highway, Highway, Sept. 2001.

Lei W., Xiao B., et al, On the Ecological Situation, Disastrous Tendency of Yangtze River Valley and the Trend of Humid Soil Agriculture in Hubei Province, International Seminar and Workshop on the RescDAM Project, Oct. 1-5, 2000, Finland.

Leica Geosystems (2006) Leica Geosystems introduces new Leica SpiderNET Network RTK module for GPS Spider, http://www.leica-geosystems. com /corporate/en/ndef/lgs_934. htm?id=443, accessed Oct 2006.

Qiu Z., Fong Y., The application of RTK in engineering surveying, Ji Lin Water Resources, Nov. 2002.

Qiu Z., The Application of RTK GPS Surveying System in the Three Gorges Project, Beijing Survey, Jan. 2004.

Trimble Navigation Ltd. (2006) Designed to manage multiple GPS receivers in a network, http://www.trimble.com/gpsnet. shtml, accessed Oct. 2006

Wu H., GPS elevation measuring technique in hydro engineering project, Geotechnical Investigation & Surveying, June 2005.

Hu Y., Zhang K., et al, An Investigation of Medium to Long Term Crustal Deformation Using Regional GPS Permanent Tracking Station Networks, International Journal of Science & Research, 43-52 Oct. 2005.

Zhang D., Cheng Q., Yang Y. et al, The Application of RTK GPS in the Cross- Section Surveying of the Haihe River, Engineering Surveying, Apr. 2002.

Zhang, K. Wu, F., Wu, S., Rizos, C., Roberts,C., Ge, L., Yan, T., Gordini, c., Kealy, A., Hale, M., Ramm, P., Asmussen, H., Kinlyside, D. and Harcombe, P. (2006) Sparse or Dense: Challenges of Australian Network RTK, Proceedings of IGNSS Symposium 2006, Holiday Inn Surfers Paradise, Australia, 17 – 21 July 2006. (80).

Zhao J., Discussion on some problems of the application of GPS on engineering surveying, Site Investigation Science & Technology, May 2005.

 

Benlin XIAO,

Prof Hubei University of
Technology, Wuhan, China 430068
benlin.xiao@mail. hbut.edu.cn
   

Fengming WAN,

Asst. Lecturer, Hubei University of Technology,
Wuhan, China 430068
   

Chang qing WU,

Lecturer, Hubei
University of Technology,
Wuhan, China 430068
   

Kefei ZHANG,

Associate Prof, RMIT University, Melbourne,
Victoria, Australia
kefei.zhang@rmit. edu.au
   
     
 
My coordinates
EDITORIAL
 
News
INDUSTRYLBS | GPSGIS  | REMOTE SENSING | GALILEO UPDATE
 
Mark your calendar
May 09 TO DECEMBER 2009

«Previous 1 2View All| Next»

Pages: 1 2

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading...