News Update


Enterprize Energy launches first floating lidar survey in Vietnam

Jun 2021 | No Comment

Enterprize Energy commissioned geo-data specialist Fugro and local partner PetroVietnam Technical Services Corporation (PTSE) to install the first floating LiDAR survey technology in Vietnamese waters at the site of the 3.4GW Thang Long offshore windfarm. This is the first time such technology has been used in Vietnam.

This announcement for the installation of floating LiDAR marks the next step in the surveying process for Thang Long, the only large-scale offshore wind farm to be granted a survey license by the Vietnamese government. To date, a full year of wind data measurements has been collected via fixed LiDAR to assess resource over the allocated area, with reconnaissance surveys to support the project team’s understanding of geological and seabed features occurring earlier this year. Based on initial results, Enterprize Energy has confirmed there will be no reduction in prospective area due to unsuitable seabed features such as basalt intrusions.

Enterprize Energy has engaged Fugro and its local partner, PTSE, to deploy Fugro’s ‘SEAWATCH Wind LiDAR Buoy’ to collect detailed wind resource, meteorological, and oceanographic data across the 2000 km2 project site over the next 12 months. The technology – comprising the SEAWATCH Wavescan Buoy as a platform into which the ZX 300M LiDAR is integrated – will track air pressure, humidity, air and water temperature, wave height and current, with support from a guard vessel which will also track fishery activity and supplementary ocean data from its own onboard sensors.

https://enterprizeenergy.com

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading...


Leave your response!

Add your comment below, or trackback from your own site. You can also subscribe to these comments via RSS.

Be nice. Keep it clean. Stay on topic. No spam.